Technical support in the design and drafting of the Cantabrian Bioeconomy and Circular Economy Strategy

The project was structured in two main phases aimed at supporting the development of the Cantabrian Bioeconomy and Circular Economy Strategy (EcBEC) through a comprehensive diagnostic and the design of a monitoring and evaluation framework.

The first phase focused on the collection and analysis of existing information. This included the compilation of studies, datasets and relevant documentation required for the preparation of the EcBEC, as well as the development of a diagnosis of the existing situation to identify key challenges, opportunities and strategic priorities.

The second phase focused on the design of the strategy’s monitoring framework and methodology. The main activities included the definition of strategic axes of action, the development of the economic and temporal programming of the strategy, and the design of indicators to measure progress and results. In addition, the project developed a proposal for the evaluation and monitoring system of the strategy and prepared a draft version of the strategy document.

  1. Client
    Government of Cantabria
  2. Solution
    Circular economy
    Public policy
  3. Dates
    05/2021 - 02/2023
  4. Location
    Spain
Elaboration of the Regional Climate Change Adaptation Plan (2023-2030)

Elaboration of the Regional Climate Change Adaptation Plan (2023-2030)

, |

The project supported the preparation of the La Rioja Climate Change Adaptation Plan 2023–2030, promoted by the Regional Ministry of … Read more

NDC Support Programme impact analysis and methodology development

NDC Support Programme impact analysis and methodology development

, |

The consultancy supported the development of a knowledge and learning package to showcase the achievements and impacts of the NDC … Read more

Polluter Pays Principle and Environmentally Harmful Subsidies

Polluter Pays Principle and Environmentally Harmful Subsidies

, |

The project supported the European Commission in the fitness check of the Polluter Pays Principle (PPP) and in the development … Read more